Metric - The User Experience Design Podcast

The Temporal Midpoint of the Sprint

Informações:

Sinopsis

The two-week sprint is totally arbitrary. We adopt the convention without really questioning the wisdom, but by such dogma of what’s-good-for-the-gander bake someone else’s practice into our organizational infrastructure. The thinking is that two weeks is just about the right time to prototype, test, scrutinize, and deliver a feature. But, is it?All it took was David Grant raising that question as part of the Facebook Journalism Accelerator about this time last year for those of us at WhereBy.Us to concede the point and, within a week or two, consolidate to one-week sprints. Basecamp, just being Basecamp, shrugs the sprint convention all together, and just published a book that largely makes it clear we’re all just navel-gazing guppies trying to emulate other startups. Shape Up, that book ☝️, made me question what practical reason do we actually need backlogs, or sprints, which was a refreshing reality check. I admit I find doing away with the backlog compelling - but that’